Kitchens, Extensions & Lofts
Partial Rewiring in Milton Keynes
We reply within one working day · No obligation · Fixed written quote
When you need it
When a Partial Rewire Makes Sense
The most urgent reason people call us for a partial rewire is a failed EICR. If you're a landlord, the law in England requires your rental property's electrics to be inspected every five years, and any C1 or C2 faults must be fixed within 28 days or less. Often that means replacing a handful of circuits rather than the whole house. We can usually start within days and give you the paperwork to prove the work is done.
The second most common reason is building work. A new kitchen, an extension or a loft conversion needs new circuits, and it's the perfect moment to replace old wiring in the rooms affected. We work alongside your builder or kitchen fitter so the first fix happens before plastering, which saves you time and mess.
A partial rewire also makes sense when one part of the house has older wiring than the rest. That's common in Milton Keynes homes that were extended in the 1980s or 1990s, and in older properties in Stony Stratford, Olney and Newport Pagnell that have been improved bit by bit.

Is a partial rewire always enough?
Not always, and we'll be honest with you. If the rest of the wiring is old, or your consumer unit has no RCD protection, adding new circuits to it can be unsafe or simply not allowed under the regulations. In that case, we'll explain whether a consumer unit upgrade or a full house rewire is the better long-term choice.
Areas we cover
Proud to Serve Milton Keynes & Surrounding Areas
We carry out partial rewires across Milton Keynes and the surrounding towns. Find your area below.
What's included
What's Included in a Partial Rewire
Single-room or floor rewires
New wiring for one room, a whole floor, or every lighting circuit, whatever your survey shows is needed.
Kitchen circuits
Dedicated circuits for ovens, hobs and appliances, plus sockets placed where your new layout actually needs them.
Extension & loft circuits
New lighting and power circuits for extensions and loft conversions, coordinated with your builder's programme.
EICR remedial work
We fix C1, C2 and FI items from your report, and provide the written confirmation landlords need to give tenants and the council.
Safe tie-in
Checking and connecting the new work to your existing consumer unit, with RCD protection on every new circuit.
Testing & certification
An Electrical Installation Certificate or Minor Works Certificate, plus Part P notification where the work requires it.
Costs
Partial Rewire Costs in Milton Keynes
Partial rewire prices vary more than full rewires because every job is different. Here are typical Milton Keynes prices:

| Job | Typical duration | Typical cost |
|---|---|---|
| Single room rewire | 1–2 days | £500 – £1,200 |
| Kitchen rewire | 2–3 days | £1,200 – £2,500 |
| Extension or loft circuits | 2–4 days | £1,000 – £2,500 |
| Additional circuit (each) | half a day | £250 – £450 |
| EICR remedial work | varies | priced from your report |
Indicative prices for Milton Keynes and surrounding areas. Your fixed price is confirmed after a free survey, or from your EICR if you send it to us.
The biggest factor in cost is whether your existing consumer unit can safely take the new circuits. If it can't, we'll quote for a new board separately so you can see exactly what you're paying for.
Why choose us
Why Choose Us for a Partial Rewire
Honest advice
We'll tell you if a partial rewire is the right call, and if it isn't, we'll tell you why.
Fast for landlords
EICR remedial work is often time-critical. We prioritise it and send you the paperwork as soon as the job is done.
We work around your builder
We coordinate first and second fix with your builder or kitchen fitter, so nobody waits on the electrician.
Certified every time
Every circuit we install is tested and certified, and notified to Building Control where required.
Need Part of Your Home Rewired?
Send us your EICR or tell us about your project, and we'll come back with a fixed price.
How it works
Our Partial Rewire Process
Survey or report review
We visit, or review your EICR, to confirm exactly which circuits need replacing.
Fixed quote
You get a written quote and a start date, with no surprises.
The work
We install the new wiring, coordinating with any other trades on site.
Test & certify
We test, certify and notify, and send you copies of everything.
FAQs
Partial Rewire FAQs
Can you rewire just one room?
Yes. As long as the circuit and your consumer unit can safely support it, we can rewire a single room. We'll check this at the survey.
Is a partial rewire enough after a failed EICR?
Often, yes. Many EICR failures relate to specific circuits or the consumer unit rather than the whole house. We'll price the remedial work directly from your report.
Will new wiring work with my existing wiring?
New circuits can be connected to an existing installation, but only if the existing system is safe and has suitable protection. If it doesn't, we'll recommend a consumer unit upgrade first.